Institutional Sign In

Go

Time Required To Build A Warehouse (days) in Czechia

Source: World Bank
Last Updated:

Time required to build a warehouse (days) reached 143 days in 2014 in Czechia, according to . This is 0% more than in the previous year.

Historically, Time Required To Build A Warehouse (days) in Czechia reached an all time high of 172 days in 2007 and an all time low of 143 days in 2009.

Czechia has been ranked 87th within the group of 167 countries we follow in terms of Time Required To Build A Warehouse (days).

$1.99

Buy Time Required To Build A Warehouse (days) data for Czechia.

from $199/month

Buy annual subscriptions for all our products.