Institutional Sign In

Go

Time Required To Build A Warehouse (days) in Saudi Arabia

Source: World Bank
Last Updated:

Time required to build a warehouse (days) reached 102 days in 2014 in Saudi Arabia, according to . This is 0% more than in the previous year.

Historically, Time Required To Build A Warehouse (days) in Saudi Arabia reached an all time high of 107 days in 2008 and an all time low of 65.0 days in 2010.

Saudi Arabia has been ranked 130th within the group of 167 countries we follow in terms of Time Required To Build A Warehouse (days).

$1.99

Buy Time Required To Build A Warehouse (days) data for Saudi Arabia.

from $199/month

Buy annual subscriptions for all our products.