Institutional Sign In

Go

Geothermal Capacity (Cumulative Installed Power Capacity) in Nicaragua

Source: EIA
Last Updated: July 14, 2021

Geothermal capacity in terms of cumulative installed power capacity reached 153 MW in 2019 in Nicaragua, according to World Bank / EIA. This is 0.971% less than in the previous year.

Historically, geothermal capacity in terms of cumulative installed power capacity in Nicaragua reached an all time high of 165 MW in 2012 and an all time low of 35.0 MW in 1990.

$2.99

Buy Geothermal Capacity (Cumulative Installed Power Capacity) data for Nicaragua.

from $199/month

Buy annual subscriptions for all our products.